zvol: use multiple taskq
Currently, zvol uses a single taskq, resulting in throughput bottleneck
under heavy load due to lock contention on the single taskq. This patch
addresses the performance bottleneck under heavy load conditions by
utilizing multiple taskqs, thus mitigating lock contention. The number
of taskqs scale dynamically based on the available CPUs in the system,
as illustrated below:
taskq total
cpus taskqs threads threads
1 1 32 32
2 1 32 32
4 1 32 32
8 2 16 32
16 3 11 33
32 5 7 35
64 8 8 64
128 11 12 132
256 16 16 256
Reviewed-by: Alexander Motin <mav@FreeBSD.org>
Reviewed-by: Tony Hutter <hutter2@llnl.gov>
Reviewed-by: Brian Behlendorf <behlendorf1@llnl.gov>
Reviewed-by: Tony Nguyen <tony.nguyen@delphix.com>
Signed-off-by: Ameer Hamza <ahamza@ixsystems.com>
Closes #15992